Every project is unique.  I will ask questions about YOUR project and find the big issues that YOU will face. No matter the problem, big or small, it is my job to give you options and to explain the advantages and disadvantages of each.  My prior experience shows that I've seen problems of all sizes and I've seen different ways to solve those problems.

exterior-2.jpg

Whipple Federal Building

completed while employed with HGA

Originally Built: 1965

Renovation: 2012

Location: Ft. Snelling, Minnesota

Size: 618,000

Budget: $200 Million

Historic Designation: None

​

Project Scope:

  • Reconfiguration of interior workspaces for 13 government agencies

  • Heating & Cooling system replacement with Geothermal system

  • Electrical & Lighting system replacement with roof mounted solar panels

  • Plumbing system replacement

​

My Role:

  • Layout and design of Veterans Affairs office areas and service areas (about half of the total area of the building).

  • Planned phasing strategy to move functions within the building to allow for construction activity to occur while the building was continuously used.

Dock Cinema / Tonka Theater

completed while employed with New History

Originally Built: 1940

Renovation: In planning stages

Location: Excelsior, MN

Size: 9,000 square feet

Historic Designation: In nationally-listed historic district

 

Project Scope:

Owners of the Dock Cinema building in Excelsior, MN were contemplating a renovation of the building and needed guidance on the applicable historic regulations.

 

My role:

Provided a report clarifying the regulations that would apply if the project intended to use the Historic Tax Credit incentive program, and which remaining features would need to remain.  I proposed design options to achieve the owner's goals and meet historic regulations.

Confluence Hotel

completed while employed with New History

Originally Built: 1914

Renovation: 2023

Location: Hastings, MN

Size: 100,000 square feet

Budget: $30 Million

Historic Designation: National Register of Historic Places

​

Project Scope:

Comprehensive rehabilitation from an industrial manufacturing and warehouse facility into a hotel, residences, restaurant, and event center.  

​

My Role:

I explained and interpreted the regulations associated with the Historic Tax Credit for the design team and the owner.  I completed the Tax Credit applications, successfully gaining SHPO approval for window replacements, brick replacement, exterior painting and other modifications needed to breathe a new use into the building.

​

​

Tonka Building

Sandbulte Architecture Project

Originally Built: 1945

Renovation: 2024

Location: Excelsior, MN

Size: 5,000 square feet

Historic Designation: In nationally-listed historic district

 

Project Scope:

Conversion of the space from a single-occupant office to a multi-tenant retail space.  

 

My role:

Architect of record, including initial concepts, space layouts, code analysis, permit drawings, and construction administration. 

 

I also worked with two of the tenants to design the fit-outs of their suites (RoJo Consignment and Visionary Bridal).

20240402_101001.jpg
Photo Nov 16 2023, 9 32 35 AM - YES.jpg

James J. Hill Library

completed while employed with New History

Originally Built: 1917

Renovation: currently in planning stages

Location: St. Paul, MN

Size: 32,000 square feet

Historic Designation: National Register of Historic Places

​

Project Scope:

The ownership team is contemplating officially using the library as an event venue, potentially triggering various upgrades to be required per building code. 

​

My Role:

I advised the ownership team regarding a code compliance path, facilitated meetings with the code official, and selected architectural and engineering team members to complete concept designs.

​

​

bottom of page